CSL Aurora project in Broadmeadows
Webb Dock West Automotive terminal
Regional Rail Link Footscray to Deer Park
The Regional Rail Link Footscray to Deer Park Alliance engaged Gearon Civil to deliver the widening and road duplication of Mount Derrimut Road and Tilburn Road in Deer Park.
The scope of works included earthworks, pavement construction, stormwater, traffic signalling and level crossing interface works to VicRoads specifications. the works involved complex staging to minimise the disruption to traffic and also work within the rail occupation schedule over the Christmas / New Year holiday period (trains services were stopped during a 3-week period).
Gearon Civil successfully completed their scope of works within the required time and worked cooperatively with our team. The scope was generally delivered on-program and all of the quality documentation was also completed as promised.
I would recommend Gearon Civil for similar civil projects and look forward to working with them again in the future.
Army Camp Retarding Basin Upgrade
Leighton Black and Veatch (formerly Thiess Black & Veatch) engaged Gearon Civil to deliver the earthworks and civil works for Army Camp Retarding Basin Upgrade.
The works involved raising the crest height to new levels, installation of a crest filter trench through the embankment, reconditioning of the upstream embankment face and construction of a conduit filter diaphragm around some significant outlet conduits requiring significant temporary works due to the depth of excavation.
Gearon also completed the new internal access roads for use by the Melbourne Water maintenance team.
Gearon successfully completed the scope of works within the required time and worked cooperatively with our team. We were pleased with the overall management of the project and the documentation completed throughout the work is to be commended.
Both the Management Team and Site Team involved in the project approached site issues with a positive and above the line attitude.
I would recommend Gearon Civil for similar civil projects. It would be a pleasure to work with them again.
Cold Storage Facility for Scott's Transport in Laverton
Spaceframe engaged Gearon Civil to deliver the civil earthworks for Scott’s Transport in Laverton.
The scope of works included Bulk Earthworks and the construction of both permanent and temporary engineered hardstand.
Gearon successfully completed their scope of works ahead of the required time and worked cooperatively with our team.
The management and workforce of Gearon were very accommodating of both our and our client’s needs.
The project was within an existing operating facility and the coordination of machinery movements within the existing operation was well handled by Gearon Civil.
I would recommend Gearon Civil Pty Ltd for similar civil projects. It would be a pleasure to work with them again. They are efficient, reliable and mindful of budget at all times.
Bulk Earthworks and Roadworks for Tarago Water Treatment Plant
Baulderstone and United Group, operating as a joint venture, were engaged by Melbourne Water Corporation to deliver the Tarago Water Treatment Plant in September 2007. The Project, located in Drouin West in West Gippsland, was completed several months ahead of schedule and under budget. The project was delivered in an alternative alliance contract with Baulderstone and United Group in partnership with GHD, SKM and Melbourne Water.
The broad scope of works included the design, procurement, construction and commissioning of the new Water Treatment Plant to treat up to 25 billion litres per year (70 ML per day capacity) based on dissolved air flotation filtration (DAFF) and ultraviolet disinfection (UV). The project involved bulk earthworks and roadwork’s, buildings and structures, underground and above ground pipe work, pump stations, water retaining structures, mechanical and electrical installation and commissioning.
In October 2007, one month after project award, Gearon Civil Pty Ltd (Gearon) were engaged to conduct all bulk earthworks and roadwork’s for the water treatment plant as well as the road widening to the existing Neerim Road. Following a rapid start, Gearon successfully completed their scope of works within the required time and enabled the commencement of structural trades to commence works at the earliest possible date.
I found both the management and workforce of Gearon worked very cooperatively with our team with an open and collaborative approach and were genuinely aligned with our safety and quality culture and project goals. Gearon remained price competitive throughout the course of the project and also completed a number of other smaller packages for various elements of the civil works with the same level of commitment and expertise.
I would have no hesitation in recommending Gearon Civil Pty Ltd for similar work and look forward to the opportunity of doing business with them again.